Portfolio
Projects I have delivered
Each project states its real context, the approach and one measured outcome. Where a client asked not to be named, I keep that and say so on the project page itself.
Industries served
- Manufacturing
- 1
- Professional services
- 1
- Retail
- 1
- Automotive
- 1
- Beauty and wellness
- 1
- Food and beverage
- 1
- Healthcare
- 1
- Education
- 1
- E-commerce
- 1
- Logistics
- 1
- 10
- projects published
- 10
- industries served
- 4
- months, typical project length
- 10
- projects published

Manufacturing · 5 months
QR traceability for exported produce
The importer required lot-level traceability. Records were handwritten and reconstructing one lot took four days on average.
Reconstructing a lot record takes under 5 minutes

Professional services · 5 months
Matter management for a ten-person law office
Files lived on personal machines, in email and in a filing cabinet. Nobody could answer the simple question: who is this matter waiting on.
Time to find a document down from 12 minutes to under 1

Retail · 4 months
Syncing stock between a shop and four marketplaces
A clothing shop sold on four marketplaces and over the counter. Stock was updated by hand each evening, so overselling was routine.
Orders cancelled for being out of stock down from 11% to 0.6%
Every project
- 04

Automotive · 3 months
Repair orders and parts quotes for a car garage
The garage quoted by text message and tracked jobs on a whiteboard. When a customer asked about their car, somebody had to walk to the workshop and look.
Quote turnaround down from 2 days to 3 hours
- 05

Beauty and wellness · 4 months
Treatment courses and reminders for a spa chain
Customers bought ten-session courses and typically stopped after the fourth. Nobody knew who was mid-course without leafing through a book.
Course completion up from 41% to 67%
- 06

Food and beverage · 3 months
Shifts and stock for a six-branch coffee chain
Six branches reported stock in a group chat each evening. The owner did not know which branch was running out until somebody sent a message.
78% fewer mid-shift stockouts
- 07

Healthcare · 3 months
An appointment system for a three-department clinic
The clinic took bookings by phone and wrote them in a paper diary. Double bookings happened weekly. I built a booking system with conflict checks and automatic reminders.
No-show rate down from 23% to 8%
- 08

Education · 2 months
Classifying admission documents with a language model
A training centre received a few thousand applications each intake and sorted them by hand. I put a model into the workflow with a quality harness and a cost ceiling.
91% of documents classified correctly without a human
- 09

E-commerce · 3 months
Rebuilding a commerce site that loaded four times slower than its competitors
The old site took over eight seconds to show its main content on mobile. I rebuilt it and kept every existing URL.
Largest contentful paint down to 1.4 seconds
- 10

Logistics · 4 months
Replacing ten logistics spreadsheets with one system
A factory ran inventory and delivery on ten shared spreadsheets. I replaced them with one system with roles and an audit trail.
6 hours of data entry saved weekly